Company history

For a more complete presentation of TADES we need to take a closer look at its history all the way since the year 1939. It was at that time that the Tajikselelektrostroy trust company was established to handle the electrification of agriculture in the Tajik Soviet Socialist Republic (TSSR).

The main objectives set for the trust were to build and commission power grid facilities, provide integrated design of 0.4-110 kV power networks with engineering and technical surveys, develop 0.4-110 kV electric mains for the advanced development of districts and regions of the TSSR through the application of high-tech economic design and construction solutions.

At the end of 1987, Tajik Design, Industrial and Construction Association for the construction of power networks TADES was established on the basis of the Tajikselelektrostroy trust, Tajik OKP, SAO Selenergoproject and Repair and Construction Agency Tajikenergoremont. TADES also incorporated the units of the planning and surveying institute Tajikenergoproject and Self-financing repair and construction site Spetsenergoremont. TADES thereby became a chief design and contracting organization for the design and construction of 0.4-220 kV power lines and 6.10/0.4 kV and 110/35/10 kV electrical substations in the Tajik SSR.

In 1999, Design, Industrial and Construction Association TADES with the State Company Barqi Tojik was transformed into the open joint-stock company Design, Industrial and Construction Association TADES, which was the main self-financing link in the management of power grid construction in the Republic of Tajikistan and constituted a single production and economic complex.

Throughout the many years since its inception, OJSC Design, Industrial and Construction Association TADES has been actively involved in all of the significant construction projects in the country: Tavildara substation, 35 kV USSR-India overhead electric line for direct connection between the two countries, 110 kV overhead electric line between the Nurek Hydro Power Plant (HPP) substation and the Tutkaul substation, power supply to the Qunduz Province of the Islamic State of Afghanistan, the Ismoili Somoni Monument, and others.

In addition to specialized goals and objectives associated with the construction, reconstruction and restoration of power facilities, in the period from 1985 through 2000, OJSC Design, Industrial and Construction Association TADES completed colossal amounts of construction and repair operations at the crucial construction sites of the national economy.

In 2004, the form of incorporation of OJSC Design, Industrial and Construction Association TADES was changed, and the company became a closed joint-stock company. In addition, the company incorporated Joint Limited Liability Company TADES International. JLLC TADES International has repeatedly participated in various tenders announced by the Centre for the implementation of projects of international credit organizations, has vast experience in making and delivering on such major contracts as Replacement of Shurchasay siphon ducts in the Khatlon Region, Rehabilitation of the Grand Hisor Canal in the Lenin District, Emergency measures for stabilizing the Baipaza landslide and many more. Later, in 2013, the company was renamed Closed Joint-Stock Company TajikHydroEnergoStroy